Projects › Industrial

PMX has diverse and extensive experience in a variety of major capital industrial projects, including hydro-electric, water/wastewater, mining, and biopharmaceutical facilities. PMX brings rigorous project management processes, systems, controls and management expertise to deliver these complex and unique projects.

Lower Churchill Project – Phase 1

Client: Nalcor Energy, Muskrat Falls
Location: Newfoundland and Labrador
muskrat-falls-generation

Project Completion: 2019
Project Value: $11 Billion

The lower Churchill River in Labrador is one of the best undeveloped hydroelectric sources in North America. With a combined capacity of more than 3,000 megawatts, Muskrat Falls and Gull Island will be able to provide 16.7 terawatt hours of electricity a year and, in turn, significantly reduce greenhouse gas emissions. This level of mitigation is equivalent to taking 3.2 million vehicles off the road each year. The Lower Churchill Project will be developed in two phases: first, Muskrat Falls and then Gull Island.

Phase one of the Lower Churchill Project includes an 824 megawatt hydroelectric generating facility located at Muskrat Falls, 500 km of high voltage AC transmission lines, 1,100 km of high voltage DC transmission lines, a 30 km crossing high voltage DC submarine cable, as well as, converters, substations, and related assets.

PMX is providing project management support services for the Muskrat Falls generating station in the areas of construction management, contract administration, and project controls.

  • Churchill_1
  • spillway-in-action

More Images

Eagle’s Nest Mine Development Project

Client: Noront Resources Ltd.
Location: Ring of Fire, Ontario
Eagles_Nest_Feature

Project Value: $600 Million

Noront Resources is an innovative, junior mining company dedicated to excellence and committed to a socially and environmentally responsible development plan. The company is currently focused on the development of the Eagle’s Nest Mine, a mineral rich deposit located in the James Bay Lowlands of Northern Ontario. Noront owns a 100% interest in this development stage of nickel-copper-platinum group elements deposit. The Eagle’s Nest site is remote and is currently only accessible by air. The Eagle’s Nest project is one of several discoveries made as part of the McFaulds Lake Project and will be the first one developed. The mine will provide nickel-copper-platinum-palladium ore. 

PMX is providing project management services to Noront Resources Ltd. including scheduling and project planning.

  • Eagles_Nest_4
  • Eagles_Nest_5
  • Eagles_Nest_6

More Images

N-Viro Bio Solids Project

Client: N-Viro Systems Canada LP
Location: Sudbury, Ontario
N-Viro_Featured Image

Project Completion: March 2015
Project Value: $70 Million

This facility is designed to handle up to 15,000 wet tonnes of dewatered biosolids per year produced by the City of Greater Sudbury (CGS). The process is an entirely enclosed system designed to protect the environment inside and out by preventing the escape of air, dust, and odours. The facility will operate throughout the year to produce approximately 30,000 tonnes of a Class A product called N-Rich® annually. 

PMX is providing project management advisory services to N-Viro Systems Canada LP.

  • N-Viro_More Images
  • N-Viro More Images
  • N-Viro_More Images

More Images

Lalor Mine Project

Client: Hudson Bay Mining and Smelting Co., Limited
Location: Flin Flon, Manitoba
Lalor_Featured Image

Project Value: $704 Million

This project involved developing three properties into producing mines: Lalor, Constancia, and Reed. The new $704 million project provided zinc, copper, and gold concentrate to support an existing smelter in Flin Flon, Manitoba. The project included a 950m production shaft, a 750m ventilation shaft, a 2.5km ramp, headframe, hoisthouse, mill, and other support infrastructure. The project was scheduled for first ore production in 2012 and overall completion in 2015. 

PMX provided project management support services to Hudson Bay Mining and Smelting Co., Limited in the area of cost management and reporting as well as contract management and administration.

  • Lalor_More Images
  • Lalor_More Images
  • Lalor_More Images
  • Lalor_More Images

More Images

Mary River Project

Client: Baffinland Iron Mines Corporation
Location: Baffin Island, Nunavut
Baffin_Feature

This project focused on the exploration and development of the Mary River Property, located in the Qikiqtani Region Nunavut on Baffin Island. The Mary River Project consists of nine plus high-grade lump and fine iron ore deposits that can be mined, crushed, and screened into saleable products. It is currently one of the largest mining developments planned in Canada, and is one of the most significant developments ever planned above the Arctic Circle. 

PMX provided project management services to Baffinland Iron Mines Corporation.

  • Baffin_1
  • Baffin_2

More Images

Geco Willroy Project

Client: Xstrata
Location: Manitouwadge, ON
Geco_Feature

Project Completion: December 2006
Project Value: $8 Million

Xstrata invested $33 Million as part of a multi-year program of upgrades and improvements to the AMD collection and treatment works at the Geco Willroy mine site near Manitouwadge, Ontario. The 2006 program, valued at $8 Million, involved the construction of a system of clean water collection dykes, pump stations, pipelines, and upgrades to existing dams and holding ponds. The project was completed under budget and ahead of schedule. 

PMX provided project management services to Xstrata from site management, planning and scheduling services to reporting.